| Sept. 2006 | BP Chemical Sdn. Bhd. | Replace the power supply unit and control relay for DCS and manpower supply. |
| Oct. 2006 | Toray BASF PBT Resin Sdn. Bhd | Installation of power and signal cable for Micro Motion Flow Transmitter Installation of 6 units lighting. |
| Jan-07 | Toray BASF PBT Resin Sdn. Bhd. | Wiring for lighting and new bagging |
| Apr-07 | Toray BASF PBT Resin Sdn. Bhd | Modification of Non seal pump motor starter wiring |
| Apr-07 | Toray BASF PBT Resin Sdn. Bhd | To do preventive maintenance for 92 unit of motor |
| Sep-07 | Toray BASF PBT Resin Sdn. | Supply material and re-wiring the old workshop |
| Jan-08 | BP Chemical Sdn Bhd. | Wiring New HBR Pump |
| Feb-08 | BP Chemical Sdn Bhd. | Upgrade PA Systems at Admin Building |
| Feb-08 | BP Chemical Sdn Bhd. | Installation 8 Units of CCTV In Process unit Area |
| May-08 | Toray BASF PBT Resin Sdn. Bhd. | Supply and Install New Fire Alarm Systems for Spare part Warehouse |
| May-06 | Intra Naluri Sdn. Bhd | Supply , Installation Testing and Commissioning of 5 Unit Diff. Pressure Controller at MTBE Sdn. Bhd. Control Room |
| Jul-06 | UBF Engineering Sdn. Bhd. | Install, Testing & Commissioning of Sampling Control System |
| Jul-06 | Yamatake Automation (M) Sdn. Bhd. | Remove & Service and Install 71 Units of Control Valve |
| Apr-June 2007 | Polypropylene (M) Sdn. Bhd. | Supply & Install All Electrical And Instrumentation Items for Various Piping Systems Project |
| June 07- Feb 08 | BP Chemical Company, Zhuhai China | Supply of Instrumentation Specialist for Pre & Commissioning activities |
| Jan 08 – Dec 08 | Bp Chemical (M) Sdn. Bhd. | Supply of Instrumentation Technician Yearly Contract |
| Feb-08 | Bp Chemical (M) Sdn. Bhd. | Installation 6 Units of Gas Unit Detector in Process unit area |
| Jun-08 | BP Chemical Sdn. Bhd | Installation For Upgrade BHV-215 & BHV-216 To Titanium Angle Valve |
| Jun-08 | Bp Chemical (M) Sdn. Bhd. | 3 Mini Projects: - Wiring Power Cable for Card Access Systems - Install Thermocouple DHT WWD Pre-heater -Install Flowmeter For Furnace Combustion Air Preheater |
| Aug-08 | Bp Chemical (M) Sdn. Bhd. | Supply of Instrument Specialist For Plant Shutdown Activities |
| Oct-08 | MTBE (M) Sdn. Bhd | Install 4 Unit Speaker for PA System |
| Nov-08 | Bp Chemical (M) Sdn. Bhd. | Install/replace new O2 Analyzer |
| Mar & July 2008 | KL VAF and Fitting Sdn Bhd | Installation of Bundle Tubing at BDO and Acrylic Plant BASF |
| Oct-08 | Toray BASF PBT Resin | Project at Spare part Warehouse, Electrical Wiring and Fire Alarm Systems |
| Oct-08 | Ranex (M) Sdn Bhd seconded to Toray BASF PBT Resin | Supply Manpower for Toray Shutdown 2008 |
| Dec-08 | MTBE (M) Sdn. Bhd | Install One Unit of Infrared (IR) Combustible Gas Detector At Cooling Tower |
| Jul-09 | TMM Engineering Seconded to Petronas Gas Berhad. | Supply Manpower, Equipment, Tools to perform Electrical & Instrument Package for Storm Water Drain Improvement at GPP 2, 3 and 4 Kerteh, Terengganu. |
| May-09 | MTBE (M) Sdn Bhd | Supply and Install Pressure Transmitter and Relocate AP4002 Primary Sample |
| Nov-09 | Siemens Malaysia Sdn Bhd | Installation, wiring and testing of 3.3kV Boiler Feed Water Pump at PDH Plant, Kuantan, Pahang. |
| Jan-10 | Polypropylene Malaysia Sdn Bhd | To Install Beacon Light at PPM Substation. |
| Feb-10 | Kemaman Bitumen Plant | Installation of 10 point Earthing rod. |
| Apr-10 | Dayang Enterprise Sdn Bhd Seconded to Petronas Carigali Sdn Bhd | Supply,Install,Testing& Commissioning of Motor Control Centre for RESAK Platform. |
| Jul-11 | Flexsys Chemicals (M) Sdn Bhd | To supply and install cable for Proximity Switch. |
| Jul-11 | Flexsys Chemicals (M) Sdn Bhd | To remove and replace 9 units of Magnetic Flowmeters including consumable and installation accessories. |
| Aug-11 | Regelung Automation (SEA) Sdn Bhd | Laying Cable at Reactor from CCR at BP Chemicals (M) Sdn Bhd |
| Dec-11 | Ethylene Malaysia Sdn Bhd | Installation of cable and Control Valve (HV851) |
| Feb-12 | Shapadu Energy & Engineering Sdn Bhd Seconded to Petronas Carigali Sdn Bhd | Supply and Install New Motor Starter and Wiring accessories at Resak Platform. |
| Apr-12 | Shapadu Energy & Engineering Sdn Bhd | Current Injection Testing for Moulded Case Circuit Breaker at SEEN Yard, KSB |
| Nov-12 | Metalux Oil & Analysis Sdn Bhd | Supply and Install New SS Tubing and accessories at Petronas Compressor Kuantan, Pahang and Segamat Johor. |
| Dec-12 | Flexsys Chemicals (M) Sdn Bhd | Supply, Install, Testing & Commissioning of One unit of O2 Analyzer complete with sampling system cabinet. |
| Dec-12 | Flexsys Chemicals (M) Sdn Bhd | Supply of Chargeman B4 on yearly basis contract. |
| Jan-13 | Flexsys Chemicals (M) Sdn Bhd | Supply Electrical & Instrument Manpower for Shutdown |
| Mar 2014 to Apr 2015 | BP Chemicals Company, Zhuhai, China | Supply of Electrical, Instrumentation, and Mechanical Specialist for Pre & Commissioning Phase 3 activities |
| Apr-15 | Sapura Kencana Petroleum Sdn Bhd seconded to Exxonmobil | Supply & Delivery of DC Uninterruptible Power Supply for Tapis-B EOR Brownfield |
| May-15 | RP Chemicals (M) Sdn Bhd | Supply of Electrical & Instrument Supervisor & Technician for Shutdown 2015 |
| April 2016 | RP Chemicals (M) Sdn Bhd | Supply of Electrical & Instrument Supervisor & Technician for Shutdown 2016 |
| June 2016 | RP Chemicals (M) Sdn Bhd | Supply of Materials & Electrical & Instrumentation Manpower for BOKELA RPF2 Project. |
| Jan 2017 to Present | Eastman Chemicals (M) Sdn Bhd | Supply of Electrical, Instrument & Mechanical Manpower for K2C & KRP Project. |
| Aug 2016 to present | RP Chemicals (M) Sdn Bhd | Contract to Supply of Electrical & Instrument Manpower for Maintenance work. |
| April 2017 to Present | Eastman Chemicals (M) Sdn Bhd | Contract to Supply of Electrical & Instrument Manpower for Maintenance work. |
| Aug 2017 to July 2020 | RP Chemicals (M) Sdn Bhd | Appointed as In-house Contractor for Construction, Fabrication and Project Services. |