Installation of 10 point Earthing rod
Installation of 10 point Earthing rod for Kemaman Bitumen Plant.
Installation of 10 point Earthing rod for Kemaman Bitumen Plant.
To Install Beacon Light at PPM Substation for Polypropylene Malaysia Sdn Bhd
Installation, wiring and testing of 3.3kV Boiler Feed Water Pump at PDH Plant, Kuantan, Pahang, for Siemens Malaysia Sdn Bhd.
Supply Manpower, Equipment, Tools to perform Electrical & Instrument Package for Storm Water Drain Improvement at GPP 2, 3 and 4 Kerteh, Terengganu, for TMM Engineering, seconded to Petronas Gas Berhad.
Supply and Install Pressure Transmitter and Relocate AP4002 Primary Sample for MTBE (M) Sdn Bhd.